Field guide · Pricing
What Does Mesquite Grubbing Cost Per Acre?
Grubbing is priced either by the machine hour or by the acre, and the per-acre number swings wider than any other figure in land clearing. That is not a dodge. It is because “an acre of mesquite” can mean thirty scattered trees you could count from the truck, or four hundred stems in a creek bottom where the machine never stops moving. Same acre on the deed, four or five times the work.
Anybody who quotes you a per-acre price over the phone without asking about density is quoting you a number, not a job.
Here is what actually moves it, so you can look at a bid and know whether it is real.

The six things that set your price
1. Stem density — the biggest factor by far
This is the number that decides everything. An excavator grubbing scattered pasture mesquite covers ground fast. The same machine in a heavy thicket is pulling continuously and stacking constantly, and it will cover a fraction of the acres in the same day. Density is why per-acre pricing is dangerous for both of us if nobody has looked at the place.
2. Tree size and root ball
A young mesquite comes out clean. A mature multi-stem tree with a root ball the size of a truck bed takes time to work loose, and it leaves a hole you have to deal with. Big trees are not proportionally more expensive — they are disproportionately more expensive. Machine size follows tree size.
3. Terrain, soil and moisture
Rocky caliche fights the bucket. Deep sand lets a root ball slide out. Slopes and breaks slow a machine down and limit where it can safely work. And ground moisture matters more than season does — workable moisture lets the crown lift out whole and keeps the day productive. Bone-dry ground can shear crowns off at the bud zone, and saturated ground ruts the pasture and slows the machine. Either extreme costs you money in the invoice and in the pasture.
4. What happens to the piles
This is the line item people forget, and it can be a real share of the job. Windrowed and left as cover is cheapest. Stacked and burned costs more and depends on conditions and county burn rules. Hauled off costs the most. Decide this before you take bids, or you are comparing bids that are not the same job.
5. Total acreage and move-in
Moving a Cat 330 to your place costs the same whether we grub twenty acres or four hundred. Small jobs carry that cost on fewer acres, which is why per-acre pricing looks worse on a small tract. If you have neighbors thinking about the same work, going in together is the single easiest way to lower everybody’s number.
6. Move-in — and the phone call that lowers it
Getting excavators, a dozer and a fuel truck to your place costs about the same whether we grub forty acres or four hundred. On a small tract that mobilization can be a bigger line on your invoice than the grubbing is. Which means the cheapest thing you can do about your per-acre number has nothing to do with negotiating with us: if the place across the fence has the same problem, go in together. One move-in split across two properties gives both of you a better number than either gets alone. Three neighbors is better still. Nobody in this business is going to volunteer that, so there it is.
Per hour or per acre — which one you want
| Item | Per machine hour | Per acre |
|---|---|---|
| Best when | Density is uneven, or you want selective work | Density is consistent and the tract has been walked |
| Who carries the risk | You do | We do |
| Budget certainty | Lower | You know the number going in |
| Habitat / pattern work | Easier to steer as we go | Has to be specified up front |
Best when
- Per machine hour
- Density is uneven, or you want selective work
- Per acre
- Density is consistent and the tract has been walked
Who carries the risk
- Per machine hour
- You do
- Per acre
- We do
Budget certainty
- Per machine hour
- Lower
- Per acre
- You know the number going in
Habitat / pattern work
- Per machine hour
- Easier to steer as we go
- Per acre
- Has to be specified up front
We will quote either way. On ground we have walked or worked off good imagery, most people want the per-acre number so they can budget it.
What the bid is actually made of
| What you are paying for | What makes it vary | Can you change it? |
|---|---|---|
| Machine hours | Stem count, tree size, terrain | Yes — by choosing what to leave standing |
| Machine size | The biggest trees on the job | Not really |
| Move-in and mobilization | Distance from Jayton or Lubbock, job size | Yes — split it with a neighbor |
| Pile handling | Burn, windrow or haul off | Yes — this is the real lever |
| Follow-up | Seedlings out of the existing seed bank | Yes — spot work, not another clearing job |
Machine hours
- What makes it vary
- Stem count, tree size, terrain
- Can you change it?
- Yes — by choosing what to leave standing
Machine size
- What makes it vary
- The biggest trees on the job
- Can you change it?
- Not really
Move-in and mobilization
- What makes it vary
- Distance from Jayton or Lubbock, job size
- Can you change it?
- Yes — split it with a neighbor
Pile handling
- What makes it vary
- Burn, windrow or haul off
- Can you change it?
- Yes — this is the real lever
Follow-up
- What makes it vary
- Seedlings out of the existing seed bank
- Can you change it?
- Yes — spot work, not another clearing job
The five questions to ask anybody bidding your place
- Are you pulling the root ball, or cutting at ground level?
- What size machines are coming — and do you own them or rent them?
- Is stacking in the price? Is burning?
- What is move-in, quoted separately from the per-acre number?
- How will I know what you actually cleared?
That last one is the question almost nobody asks, and it is the one that costs them. Most brush work in this country is billed off the contractor’s word for what got done. We run GPS on the machines and hand you a mapped record when the job is finished — where we worked, what came out, what we left standing. You are not taking our word for it. See the record.
Why the cheap bid is the expensive pasture
Shredding and dozing bid lower per acre than grubbing every time. They also leave the bud zone in the ground, which is the tissue a mesquite resprouts from — so the pasture comes back, usually thicker and multi-stemmed, and in a few years you are buying it again.
Run it over ten years instead of over one invoice. Shredding is a subscription. Grubbing, done below the bud zone, is a purchase, followed by cheaper spot work on seedlings. Landowners out here have paid to clear the same ground three times in twenty years and never gotten ahead of it. The cheaper number on the day is what did that.
When grubbing is not the right call
We would rather lose a job than sell you the wrong one. Grubbing is not the answer everywhere:
- Scattered seedlings and whips. Small, scattered stems are hand-tool or individual-plant work. Bringing an excavator to them is paying for iron you do not need.
- Cattle-only pasture on a tight budget. If a pasture is cattle and nothing else, spraying does the job and does it cheaper. Plenty of good operators use it well. The trade is the forbs — read grubbing vs. spraying before you decide.
- Ground a machine should not be on. Steep breaks, heavy rock or terrain an excavator cannot work safely is not a grubbing job at any price.
- Cover that is doing a job. Heavy brush along a drainage or in broken country is often holding soil, water and wildlife. Clearing it is a decision you cannot undo quickly, and we will tell you when we think you should leave it.
- Density that does not pencil out. Sometimes the stem count makes mechanical work uneconomic for what the ground will return. We will say so before we bid it.
How to get a real number in one phone call
Have these five things ready and we can usually get close before anybody drives out:
- County and rough location
- Acres you want treated — not total ranch acres
- How thick it is, in your own words: scattered, moderate, or you can’t walk through it
- Biggest trees out there, roughly
- What you want done with the piles
Then we look at it on satellite, and if it is a fit we walk it. You get a real number for your ground instead of a range off the internet.
Common questions
Is grubbing more expensive than spraying?
Per acre on the day, usually yes. Over the life of the pasture it depends on what you are managing for. Spraying is cheaper and it works — but the mesquite products in wide use are broadleaf-selective by design, and forbs are broadleaf plants. On a cattle-only pasture that trade is fine. On ground you hunt, the forbs are the quail food base, and that is a different calculation. We wrote that comparison out in full on the spraying-versus-grubbing page.
Is grubbing more expensive than shredding?
On the invoice, yes. Shredding cuts the top off and leaves the bud zone, so it resprouts. Grubbing removes the root crown below the bud zone, so that tree has nothing left to resprout from. You are not comparing two prices for the same result.
Do you charge to come look at it?
No. Call with the county and the acreage and we will tell you honestly whether we are the right outfit for it. If we can’t get to your place, we will say so instead of stringing you along.
What is the minimum job you will take?
It depends more on where you are than on how many acres. Move-in is the same for a small tract as a large one, so small jobs work best when we are already working in that county. Call and ask — we may already be next door.
How long does it take?
Density and machine count drive it, not acreage alone. Two real jobs for scale: about 520 acres of very heavy canopy mesquite in Shackelford County ran roughly six and a half months with a Cat 330, a D3 dozer and skid steers. About 320 acres in Garza County — ground that had been anchor chained decades earlier, so the root structures were enormous — ran about a year. Thin pasture goes far faster than either. We own our iron rather than renting it, which is why we can hold a date when everybody else is waiting on a rental yard.
Will it come back?
Not a tree that was grubbed out below the bud zone — the tissue it would resprout from is gone. A crown that shears off above that zone can resprout, which is why moisture, machine size and operator matter. You will also get new seedlings from the seed bank and from cattle moving beans onto the place — those are spot work, not another clearing job.
Why won’t you just quote me per acre over the phone?
We will give you a number. We will not give you one before we have looked at aerial imagery of your place or walked it, because a per-acre price quoted blind is either padded to protect us or it is the opening of a change order later. Give us the county and rough acreage and we will look at it and call you back with something real.
Does a bigger job cost less per acre?
Usually. Move-in spreads across more acres and the crew settles into a rhythm. That is the main reason a 40-acre job and a 400-acre job on the same ground do not carry the same per-acre number.
Get a number for your ground
Call 833-667-3262 or email info@texasgrubbing.com. County, acres, and how thick it is.
Jayton and Lubbock, working the Rolling Plains, Permian Basin and Big Country.